Ignoring the growing opposition to the construction of walls along the border, DHS Secretary Chertoff is pushing for hundreds of miles to be built in 2008. This despite the fact that Chertoff himself said back in July,
"Fencing is not the cure-all for the problem at the border. I think the fence has come to assume a certain kind of symbolic significance which should not obscure the fact that it is a much more complicated problem than putting up a fence which someone can climb over with a ladder or tunnel under with a shovel.”
Instead of searching for substantive solutions to border issues, Chertoff is plowing ahead with the hollow symbol of the wall. To quickly lay the groundwork the Department of Homeland Security has once again hired a private contractor,
e2M, to sell the wall. In the past month they have issued a steady stream of reports that are intended to give the impression that the environmental and societal impacts of the wall have been thoroughly evaluated, and that the National Environmental Policy Act is being complied with. One of the requirements of NEPA is public input and openness, so brief public comment periods have been established for each sector's report. It is vital that they hear from us, as our comments will become part of the official public record. DHS has recently taken to lying to Congress and the press about the inclusion of public input into the border wall process. A flood of comments opposing the wall will make it more difficult for them to lie about public support for the border wall.
Below is the information needed to access and comment upon each of the newly released reports.
San Diego, California4 miles will be added to the existing wall.The Draft Environmental Impact Statement is available at
http://www.borderfencenepa.com/san-diego-sector-eis/To submit a public comment:
Electronically through this website:
SAN DIEGO SECTOR EIS COMMENT FORMBy email to:
SDcomments@BorderFenceNEPA.comBy mail to: San Diego Sector Tactical Infrastructure EIS, c/o e²M, 2751 Prosperity Avenue, Suite 200, Fairfax, Virginia 22031
By Fax to: (757) 257-7643
The public comment period ends February 11, 2008Also near San Diego, California30 more miles of wall will be built.The Draft Environmental Assessment is available at
http://www.borderfencenepa.com/san-diego-sector-ea/To submit a public comment:
By email to:
SDEAcomments@BorderFenceNEPA.comBy mail to: San Diego Sector Tactical Infrastructure EA, c/o Gulf South Research Corporation, Baton Rouge, Louisiana, 70820
By Fax to: (225) 761-8077
The public comment period ends February 5, 2008In El Paso, Texas 24.5 miles of wall will be built.The Draft Supplemental Environmental Assessment is available at
http://www.borderfencenepa.com/el-paso-sector-sea/To submit a public comment:
By email to:
DSEAcomments@BorderFenceNEPA.comBy mail to: El Paso Sector, Deming Station, Tactical Infrastructure SEA, c/o Gulf South Research Corporation, 8081 GSRI Avenue, Baton Rouge, Louisiana 70820
By Fax to: (225) 761-8077
The public comment period ends February 16, 2008In Tucson, Arizona7.6 miles of new wall will be built.The Draft Environmental Assessment is available at
http://www.borderfencenepa.com/tucson-sector-ea/To submit a public comment:
Attend and submit comments at the public open house to be held 4:30 p.m. to 8:00 p.m. on January 31, 2008 at the Tucson Convention Center, 260 South Church Avenue, Tucson, Arizona 85701Electronically through the Web site at:
http://www.borderfencenepa.com/By email to:
TSEAcomments@BorderFenceNEPA.comBy mail to: Tucson Sector Tactical Infrastructure EA, c/o Gulf South Research Corporation, 8081 GSRI Avenue, Baton Rouge, Louisiana 70820
By Fax to: (225) 761-8077
The public comment period ends February 16, 2008.Near Yuma, Arizona14 miles of wall will be built.The Draft Supplemental Environmental Assessment is available at
http://www.borderfencenepa.com/yuma-sector-sea/To submit a public comment:
Attend and submit comments at the public open house to be held 4:30 p.m. to 8:00 p.m. on January 30, 2008 at the Shilo Inn Hotel, 1550 South Castle Dome Avenue, Yuma, Arizona 85365, (928) 782-9511Electronically through the Web site at:
http://www.borderfencenepa.com/By email to:
YSEAcomments@BorderFenceNEPA.comBy mail to: Yuma Sector Tactical Infrastructure SEA, c/o Gulf South Research Corporation, 8081 GSRI Avenue, Baton Rouge, Louisiana 70820
By Fax to: (225) 761-8077
The public comment period ends February 20, 2008Near Marfa, Texas11 miles of wall will be built.The Draft Environmental assessment is available at
http://www.borderfencenepa.com/marfa-sector-ea/To submit a public comment (if you missed the January 23rd protest):
Electronically through the Web site at:
MARFA SECTOR EA COMMENT FORMBy email to:
MScomments@BorderFenceNEPA.comBy mail to: Marfa Sector Tactical Infrastructure EA, c/o e²M, 2751 Prosperity Avenue, Suite 200, Fairfax, Virginia 22031
By fax to: (757) 299-8444
The public comment period ends February 6, 2008.